@kokonutnetwork
Agenda Objectives; Complete all surveys to finalize Adelphi's profile and budget based on current prices and prepare the deliverable for early next week.
Infrastructure Assessment
— Survey of existing structures, including the chicken coop, gazebos, and other elements, led by Architect Alexander Arias Lora.
Electrical Systems Evaluation
— Assessment of the current condition of the electrical pole by Engineer Edward Sepúlveda.
— Identification of pump types and energy consumption requirements.
— Survey of low-voltage electrical needs.
Topographic Survey
— Conduct a drone-based survey to produce orthophoto and contour lines, led by Surveyor Nolan Durán.
LFG 🌱🌴🌲