TLDR by Grok π€
- 0 replies
- 1 recast
- 2 reactions
One of the milestones for the ReFi on @arbitrum Grant that we received last year was nurturing and onboarding local businesses into our Distribution Channels. This is the packaging we will place at our partner's location. The next step is to get the non-GMO certification for our methodologies.
- 0 replies
- 0 recasts
- 1 reaction
Agenda Objectives; Complete all surveys to finalize Adelphi's profile and budget based on current prices and prepare the deliverable for early next week. Infrastructure Assessment β Survey of existing structures, including the chicken coop, gazebos, and other elements, led by Architect Alexander Arias Lora. Electrical Systems Evaluation β Assessment of the current condition of the electrical pole by Engineer Edward SepΓΊlveda. β Identification of pump types and energy consumption requirements. β Survey of low-voltage electrical needs. Topographic Survey β Conduct a drone-based survey to produce orthophoto and contour lines, led by Surveyor Nolan DurΓ‘n. LFG π±π΄π²
- 0 replies
- 1 recast
- 1 reaction