evan | hiring eng @ Lazer pfp
evan | hiring eng @ Lazer

@thebc12

Projects can be being built for a long time, but the speed in which the industry moves is faster than regular tech. Therefore, evaluating needs has to be done at a faster pace. Not for EVERYTHING. but lots of things.
1 reply
0 recast
1 reaction