Fabri pfp
Fabri

@fabriziogianni7

I'm so happy! I finally set up my clawdbot!! Ordered my new NVIDIA DGX H200 station (8× H100 GPUs, 1TB HBM3 total) + extra networking. Installed three-phase power (30kW circuit), and set up liquid cooling loop with rooftop chillers next to the wines in my cantina, so they too stay cool. Built air-gapped network: one segment for the node, bridged segment for messaging integrations, then I Installed redundant UPS and monitoring (temp, power draw via IPMI).
2 replies
0 recast
5 reactions