
just a guy kiskiw
76 Followers
I have secured my place among the 2525. I am now an Apostle, holding a claim to the The Spirit ($βREDACTED). Join the Gathering. The Miracle has begun
SYYNTARDIO #5 3D Model @protardio
A very magical moment appeared when I was working on a bounty at /poidh x @protardio , at that time I made a 3D model inspired by syyntardio, and BOOM!! besides winning the bounty at poidh I was able to get WL phase 1 which in that phase was filled with great people who were in the facaster, it was an moment that I had never expected. Thank you @kenny for making this great mini app, and thank you also @protardio for the opportunity. https://poidh.xyz/account/0xdF5A944221cA0590a70d9754bcb78e0BEF9cdAC2
β‘Hazardβ‘ π Location Central Kaliabang, North Bekasi, Bekasi, West Java, Indonesia -6.177535129769553, 106.99893519906064 π Description of the Issue Utility cables (electricity and telecommunications) are extremely messy and disorganized on public poles along the road. The main problems are: - Safety Risk: Heavy cables weigh down the poles, increasing the risk of collapse or electrical short circuits, especially during heavy rain or strong winds. - Accessibility: Low-lying cables pose a hazard to road users and large vehicles. - Aesthetic Blight: Degrades the quality of public spaces and the visual value of residential areas. π° Rough Cost Estimate For permanent repairs using a Shared Ducting System (Underground Cables): Estimate: Approximately IDR 3,000,000,000 β IDR 5,000,000,000 / kilometer ($280 USD - $480 USD / Mil), depending on the complexity of the excavation and cable relocation. @poidhbot @kenny